IET Wales South East presents:

London Power Tunnels - Re-wiring London and connecting with the capital More Events

Speaker:
Liam Walker Lead Project Manager London Power
Date/Time:
Wednesday 16th June 2021 @ 6:00 PM Local time (UTC +1 hours)
Venue:
Online via Zoom
Details:
"National Grid is building a new network of cable tunnels, 32.5km in length, between Wimbledon and Crayford. This project is the second phase of the scheme to rewire the Capital, called London Power Tunnels. It follows the success of the first phase, which was a seven-year, ���£1 billion programme, building 32km of tunnels and two new substations in North London."

Thank you for your interest in one of our earlier events.

If you attended this event, why not tell us what you thought by sending us feedback? Please visit our feedback page and enter your booking reference.